In this project preliminary and
definition studies were performed, which were the
following:
01.- SURFACE WATER EXPLORATION AND WELL DRILLING
STUDY
02.- LIMON DE LA CERCA SANITARY SEWER AND WATER
SYSTEM
03.- RETROFIT EXISTING UTILITIES AND WATER STORAGE
04.- WATER STORAGE FOR BONNACA ISLAND
05.- SEWAGE LAGOONS, AMARATECA.
06.- ELECTRICAL DISTRIBUTION AND WELL PUMP, BAJAMAR.
01- SURFACE WATER/WELL
DRILLING STUDY Geophysical and geological
investigation, exploratory drilling of 8” with
casing 8”of
PVC pipe SDR-21 including pumping tests, electric
resistivity profile and physical,
chemical and bacteriological analysis of water.
TECHNICAL INFORMATION:
1 Geophysical and geological Investigation Glb 01
2 Exploratory drilling 8” ft 700
3 Casing of PVC Pipe 8” SDR-21 ft 250
4 PVC Pipe 8” SDR-21 ft 700
5 Preliminary pumping test hr. 02
6 Staggered pumping test hr. 08
7 Constant flow pumping test hr. 24
8 Electric resistivity profile Glb 01
9 Physical, chemical and bacteriological Unit. 01
02-
LIMON DE LA CERCA SANITARY SEWER
SYSTEM AND WATER SUPPLY SYSTEM
Sanitary Sewer System, include:
Supply and installation of HDPE Pipe DR-32 D=12” and
D=18” and PVC Pipe D=15”, manholes of masonry walls,
pump house, electrical installations in pump house
and security fence; Water Supply System, include
supply and installation of PVC Pipe 8”, discharge
channel, maintenance house, hypo-chlorinator,
electrical installations in maintenance house,
security fence and typical well.
TECHNICAL INFORMATION:
1 Excavation m3 12,500
2 Sand bed m3 1,500
3 Filling and Backfilling m3 10,200
4 Removal of Surplus material m3 5,000
5 HDPE Pipe DR-32 D=12” m 3,000
6 HDPE Pipe DR-32 D=18” m 1,000
7 PVC Pipe SDR-17 D=15” m 4,000
8 PVC Pipe SDR-26 D=8” m 2,500
9 Security Fence m 130
10 Concrete in Structures m3 350
11 Masonry Walls m2 700
12 Hypochlorinator Unit. 01
13 Typical Well Unit. 01
03-
RETROFIT EXISTING UTILITIES & WATER
STORAGE
Retrofit existing utilities, Nueva
Masicales, include: Supply and installation of PVC
Pipe 6” and 8” for water and sewage, water tank
120,000 gln, manholes, treatment plant, ditchs,
headwalls and service connections; Water Storage,
Supply and installation of PVC Pipe 4”, 6” and 8”,
sewage lagoon, septic tank, manholes and concrete
structures.
TECHNICAL INFORMATION:
1 Excavation m3 21,600
2 Sand bed m3 1,200
3 Filling and Backfilling m3 15,600
4 Removal of Surplus material m3 8,300
5 PVC Pipe RD-41 D=4” m 1,500
6 PVC Pipe RD-41 D=6” m 3,000
7 PVC Pipe SDR-26 D=4” m 1,600
8 PVC Pipe SDR-26 D=6” m 6,000
9 PVC Pipe SDR-26 D=8” m 5,600
10 Concrete in Structures m3 1,000
11 Masonry Walls m2 4,700
12 Service Connections Unit. 200
13 Manholes Unit. 50
14 Water Tank 120,000 Gln Unit. 01
15 Treatment Tank Unit. 01
16 Septic Tank Unit. 01
17 Ditchs m 6,500
18 Headwalls Unit. 200
04-
WATER STORAGE FOR BONNACA ISLAND (THE
CAY)
Water storage for Bonnaca, Guanaja,
include: Supply and installation of Ductile Iron
Pipe 6”, 8” and 10” , supply and installation of PVC
Pipe SDR-26 1”, 3”, 4”,6” and 8”, water tank, repair
of existing dams and construct of new dam.
TECHNICAL INFORMATION:
1 Excavation m3 3,700
2 Sand bed m3 1,000
3 Filling and Backfilling m3 2,200
4 Removal of Surplus material m3 1,500
5 Ductile Iron Pipe D=6” M 2,500
6 Ductile Iron Pipe D=8” M 700
7 Ductile Iron Pipe D=10” M 1,800
8 PVC Pipe SDR-26 D=1” M 1,800
9 PVC Pipe SDR-26 D=3” M 1,200
10 PVC Pipe SDR-26 D=4” M 250
11 PVC Pipe SDR-26 D=6” M 750
12 PVC Pipe SDR-26 D=8” M 200
13 Concrete in Structures M3 750
14 Water Tank Unit. 01
05-
SEWAGE LAGOONS AND RETROFIT OF
EXISTING UTILITY NETWORK
Sewage Lagoons, include: Supply and
installation of PVC Pipe 4”, 6”, 8”, 10” and 12” for
sewage, manholes, service connections, pump station,
sewage lagoons, culverts; Retrofit of existing
Utility, include: Supply and installation of PVC
Pipe 2”, 3”, 4” and 6” for water, pump house,
service connections and box valves.
TECHNICAL INFORMATION:
1 Excavation M3 51,700
2 Filling and Backfilling M3 47,800
3 Removal of Surplus material M3 260
4 PVC Pipe RD-41 D=4” M 1,500
5 PVC Pipe RD-41 D=6” M 7,600
6 PVC Pipe RD-41 D=8” M 3,200
7 PVC Pipe RD-41 D=10” M 570
8 PVC Pipe RD-41 D=12” M 1,130
9 PVC Pipe RD-26 D=2” M 12,200
10 PVC Pipe RD-26 D=3” M 3,750
11 PVC Pipe RD-26 D=4” M 600
12 PVC Pipe RD-26 D=6” M 60
13 Concrete in Structures M3 150
14 Masonry Walls M2 750
15 Service Connections Unit. 2,800
16 Manholes Unit. 260
17 Pump House Unit. 04
18 Sewage Lagoon Unit. 01
19 Culvert M 20,000
06- ELECTRICAL DISTRIBUTION & WELL PUMPS
AND WASTEWATER PUMPING STATION
Electrical distribution & Well Pumps,
include: Electrical distribution, modification in
existing primary net, wood poles, insulations,
transformers, guys, wirings and submersible pumps;
Wastewater Pumping Station, include: Pump station,
wet well,
manholes, force main and security fence.
TECHNICAL INFORMATION:
1 Excavation M3 1,750
2 Filling and Backfilling M3 1,500
3 Removal of Surplus material M3 320
4 Wood Poles Unit. 75
5 Insulation Unit. 100
6 Transformers Unit. 2
7 Guys Unit. 60
8 Wiring Unit. 3,100
9 Submersible Pumps Unit. 3
10 Pump Station Unit. 01
11 Manholes Unit. 01
12 Wet well Unit. 01
13 Security fence m 160 |
 |
|