The project consisted in carrying
potable water to a concrete storage tank of 120,000
gallons of capacity, through a water supply line of
7,500 linear meters of PVC pipe of 6” of diameter.
Before the arrival of the water line to the tank, a
water treatment plant will be constructed There was
also the installation of a sewer line for a
population of 60 housings, two septic chambers were
constructed for the treatment of the sewer.
|