This project consisted in the
construction of two water lines of 5,000 linear
meters each, with 6” PVC pipe and also in some
places with ductile iron pipe (this material was
placed in critical topographic zones). The water
lines will start in water supply source and will go
through the intake of two existing water tanks.
Within the project it is also contemplated the
cleaning and operation of an existing water well and
its corresponding connection to one of the existing
water tanks, through the installation of a new
impulsion line of 80 linear meters with PVC pipe of
2”.