This project consisted in the construction of two water lines of 5,000 linear meters each, with 6” PVC pipe and also in some places with ductile iron pipe (this material was placed in critical topographic zones). The water lines will start in water supply source and will go through the intake of two existing water tanks.
Within the project it is also contemplated the cleaning and operation of an existing water well and its corresponding connection to one of the existing water tanks, through the installation of a new impulsion line of 80 linear meters with PVC pipe of 2”.
 

1 Excavation m3 4,800
2 Sand bed m3 1,500
3 Backfilling m3 3,500
4 Removal of exceeding material m3 1,300
5 PVC Pipe SDR-27 D=4” m 100
6 PVC Pipe SDR-27 D=6” m 120
7 Ductile iron Pipe D=8” m 13,000
8 Security fence m 20
9 Concrete in structures m3 300
10 Pump Station unit 01