Hangar, site work (1,500 m2 flexural
concrete, 800 m3 reinforced concrete, 18,000 m2
geotextile, 6,000 m2 x .15 m filter layer, 6,000 m2
x .25 m sub-base, 6,000 m2 x .15 base-course, 6,000
m2 compacted concrete, 3,150 m2 bituminous surface
treatment incl. survey works, 10,850 m3 unclassified
excavation, storm drainage system with concrete
culverts, supply and installation 1,350 m of 22.9 kv
high tension supply line incl. poles, pad mounted
transformer and 1,600 m secondary electrical line;
HVAC systems). CEGAZ has been performing all work
and always ahead on schedule.
The project consisted of the design and construction
of site installations (fences, gates, site offices,
warehouse for materials and tools, machine shop,
carpentry shop, welding shop, powerhouse building,
aggregates crush plant, concrete plant, storage
areas, water supply systems incl. deep well - water
tanks and underground storage tanks, sewer systems,
electrical supply systems, dressing and sanitary
installations for workers, kitchen and cafeteria),
preliminary works, earthworks, pavement, concrete
works: reinforced concrete in footings, beams,
slabs, columns, rigid pavement, masonry, stucco,
revetments and plaster, steel structures, wood
works, steel works, sanitary installations,
electrical installations (high tension supply line
incl. power station) & supply and installation of
other equipments (rollup door, 2.00 ton overhead
bridge crane, heavy compressor and air compressed
line, 6 motorized 4.50 ton sliding hangar doors,
hydropneumatic water supply system, electrical
grounding system, lightning system, telephone
system, against-explosion special electrical outlets
110 volts and 230 volts, HVAC systems); access
roads, parking areas, incl. 3/8” bituminous surface
treatment, and storm drainage system with concrete
culverts.
|
|
1 |
Clearing
and Grubbing |
m2 |
38,400 |
|
2 |
Non
classified excavation |
m3 |
31,600 |
|
3 |
Subgrade
shaping |
m2 |
33,500 |
|
4 |
Compact
Concrete (e = 4") |
m2 |
30,100 |
|
5 |
Selected Subbase
"D" |
m3 |
31,700 |
|
6 |
Crushed
base graduation "B" |
m3 |
9,900 |
|
7 |
Sub.drainage filter layer |
m2 |
8,500 |
|
8 |
Geotextil
|
m3 |
17,000 |
|
9 |
Flexural
Concrete slab |
m3 |
1,800 |
|
10 |
Reinforced
structural concrete |
m3 |
800 |
|
11 |
Storm
drainage system |
ml |
4,200 |
|
12 |
Pumping Net (8") |
ml |
1,200 |
|
13 |
Power House including
Generator of 250 KVA |
unit |
1 |
|
14 |
Supply and installation of
air compressed line to 250 psi, 10 lts/sec
(including compressor, main line 1”,
secondary net ¾”) |
ml |
380 |
|
15 |
Supply and installation of
high tension line 22.9 KV including poles |
ml |
1,650 |
|
16 |
Manholes |
unit |
87 |
|
17 |
Supply and installation of
rigidly framed structure (Hangar) (280 Ton) |
m2 |
2,400 |
|
18 |
Supply and installation of
electric sliding large doors (Hangar) |
m2 |
480 |
|
19 |
Supply and installation of
electrical systems (including primary and
secondary net, security and emergency
circuits, special AC/DC circuits for testing
helicopter motors) |
unit |
1 |
|
20 |
Supply and installation of sewer system (including
primary and secondary net, manholes, grease traps,
septic tanks, chlorination tanks, oxidation pond) |
unit |
2 |
|