Base bid, bid option nº1, bid option
nº2, bid option nº3, bid option nº4, bid option nº5,
bid option nº6 and bid option nº7 (1,800 m2 flexural
concrete in staging & shore side area incl. 3,600 m2
geotextile and 2,500 m2 compacted concrete, 3,280 m3
reinforced concrete, 57,800 m3 unclassified
excavation, storm drainage system with concrete
culverts; water supply system incl. 60 m length and
12” diameter deep well, 12 m deep and 4 m diameter
caisson, 180 m3 underground storage tanks with a
2,300 m water pumping line of 8” diameter and
pumping systems with 12 lt/sec capacity; supply and
installation 1,500 m of 22.9 kv and 960 m of 10 kv
high tension supply line incl. poles, transformers
and sub-stations and 1,600 m secondary electrical
line; supply and installation of backup power
generation; HVAC systems). CEGAZ has been performing
all work and always ahead on schedule.
The project consisted of the design and construction
of different buildings (mess hall, kitchen, gym,
temporary kitchen, bachelor officer quarter’s, u.s.
instructors quarters, 12 family housing site #
1-IQT, rifle range, small arms range, shore side
access with piling deep foundation, power
distribution, 18 guard towers, surge barracks,
obstacle course, swimming pool, security wall and
gates, officer’s and 3 duplex senior officer’s
family housing at Nanay site, bakery, officer’s
family housing duplex site # 2-IQT with piling deep
foundation, docking area with piling deep
foundation), incl. site installation facilities in
different locations (fences, gates, site offices,
warehouses for materials and tools, machine shops,
carpentry shops, welding shops, powerhouse
buildings, concrete plant, storage areas, water
supply systems incl. deep well - water tanks in
caisson’s construction and underground storage
tanks, sewer systems, electrical supply systems,
dressing and sanitary installations for workers,
kitchen and cafeteria), preliminary works,
earthworks, concrete works: piling deep foundation,
reinforced concrete in footings, beams, columns;
masonry, stucco, and plaster, steel structures, wood
works, steel works, sanitary installations (water
distribution and sewer systems, sand bed filters),
electrical installations (primary and secondary
lines, power distribution system, high tension
supply line, backup power generation), furnishings
and equipments installations (supply and
installation of other equipments like:
hydropneumatic water supply systems, electrical
grounding systems, lightning systems, telephone
systems, against-explosion special electrical
outlets 110 volts and 230 volts, HVAC systems).
|
 |
|
|
1 |
Clearing
and Grubbing |
m2 |
980,000 |
|
2 |
Non
classified excavation |
m3 |
720,000 |
|
3 |
Subgrade
shaping |
m2 |
840,000 |
|
4 |
Compact
Concrete (e = 4") |
m2 |
275,000 |
|
5 |
Selected Subbase
"D" |
m3 |
180,000 |
|
6 |
Crushed
base graduation "B" |
m3 |
120,000 |
|
7 |
Sub.drainage filter layer |
m2 |
280,000 |
|
8 |
Geotextil
|
m3 |
280,000 |
|
9 |
Flexural
Concrete slab |
m3 |
3,580 |
|
10 |
Reinforced
structural concrete |
m3 |
14,750 |
|
11 |
Storm
drainage system |
ml |
11,600 |
|
12 |
Floating raft of pumping fluvial water (10
lts / sec) Including solids sedimentation
system with serial chambers battery, filter
tanks, pumping houses, chlorination systems |
unit |
2 |
|
13 |
Elevated tank of concrete (H = 35m) |
m3 |
280 |
|
14 |
Underground cistern for water storage |
m3 |
180 |
|
15 |
Pumping net (8") |
ml |
3,500 |
|
16 |
Power
House including Generator of 135 KVA |
unit |
4 |
|
17 |
Supply
and installation of high tension line 10 KV |
ml |
7,900 |
|
18 |
Supply
and installation of tension transformers,
aerial and pad mounted |
unidad |
16 |
|
19 |
Construction of US Officer’s Quarters,
Instructor’s Quarters, Barracks (including
lightning rod systems, air conditioning, hot
and cold water, telecommunications,
furniture) |
m2 |
7,800 |
|
20 |
Construction of Mess Hall /
Kitchen, Mess Hall / Gym,warehouses, shops
(including boilers room, steam lines, frigorific
chambers, grease traps, hvac systems, compressor
with air compressed lines, hot and cold water nets,
sewer nets, lightning rod system, power houses
with emergenct system for power supply |
m2 |
18,500 |
|
21 |
Construction of 24 Family
Housings totally equipped (including lightning rod
systems, air conditioning, hot and cold water,
telecommunications, furniture, kitchens, living
rooms, bedrooms) |
m2 |
6,900 |
|
22 |
Construction and
implementation of a swimming pool for training of
navy officers, including control house,
electromechanical equipment) |
m2 |
3,800 |
|
23 |
Construction and
implementation of Small Arms Range and Rifle Range
(including protection fence of wire mesh, control
towers, drainage system, protection slopes, alarm
system) |
m2 |
67,500 |
|
24 |
Asphalt Sheet 5 cm |
m2 |
128,300 |
|
25 |
Hydropneumatic systems of
water pumping for buildings |
unit |
18 |
|
26 |
Sewage treatment system
(including primary and secondary nets, sewer
manholes, grease traps, septic tanks, chlorination
tanks, bed filter sand, oxidation ponds |
unit |
4 |
|
27 |
Construction and
implementation of Obstacle Course |
m2 |
30,000 |
|
28 |
Construction and
implementation of a fluvial loading platform with
shore side access (including foundation with piling
diam=24”x35mt, concrete ramps, concrete stairs,
hoist system with cable and electric winch,
protection handrails, security sytems, warehouses) |
m2 |
5,500 |
|
|