|
This building was constructed with
CMU walls, special architectonic finishings, video
surveillance system, fire alarm system sprinkler
type, air conditioning system. The roof is of
metallic structure witch pre-painted zinc covering
sheets. This building also includes an emergency
self power generation system. The total construction
area is of 790 m2.
|