The Project consisted in the Build of
the Building dedicated to the police intervention as
center of antidrug operations including all
facilities, which were integrated in the following
way:
| -
Administration Building |
210 m2 |
| -
Jail Building |
162 m2 |
| -
Mess Hall Barracks |
324 m2 |
| - B.O.Q. |
156 m2 |
| -
Parking Area
|
441 m2 |
| -
Access Ramp (Rigid Entrance)
|
108 m2 |
| -
Guard Towers |
30 m2 |
| -
Exterior Civil Works |
1,200 m2 |
All buildings are reinforced concrete with CMU walls
and stucco finish. All floors and bathrooms are
ceramic tile finished and the building has cold and
hot water. The Project has two Guard Towers located
strategically. The jail doors and hardware are
specials, fire proof and with high security
parameters.
Roofing consists in a pre-finished standing seam
metal roof with a thickness 0.6 mm for all
facilities.
Electrical installations are specials and the
building has: explosion proof and water proof boxes,
receptacles outlets and switches.
The water system provides directly of water from the
public service to a constant pressure.
Also was built civil works for the good operation of
the system; such as: vehicles access ramp; concrete
slab for parking; sewage system including manholes,
grease trap and septic tank; water system; perimeter
security fencing; security wall fencing; rolling
main gate; exterior electrical system including
transformer bank and generator and drainage system
with concrete ditches.
There is a functional distribution of sidewalks for
the traffic between the buildings.
|