|
 |
|
Construction of concrete slab,
concrete curbs, grate inlet, oil/water separators,
vehicle inspection, bollards and asphalt pavement 2”
|
 |
|
|
1 |
Excavations |
m3 |
1,200 |
|
2 |
Filling and backfilling |
m3 |
550 |
|
3 |
Elimination of Unsatisfactory materials |
m3 |
1,600 |
|
4 |
Curbs |
m |
70 |
|
5 |
Concrete in Slab |
m3 |
250 |
|
6 |
Grate
inlet |
unit |
01 |
|
7 |
Concrete in Structures |
m3 |
55 |
|
8 |
Corrugated Steel |
kg |
3,500 |
|
9 |
Bollards |
unit |
02 |
|
10 |
Asphalt Priming |
m2 |
2,100 |
|
11 |
Asphalt Paving 2” |
m2 |
2,000 |
|
|