Hangar, site work, option nº1 (1,800
m3 flexural concrete, 800 m3 reinforced concrete,
6,000 m2 geotextile, 6,000 m2 x .40 m sub-base,
6,000 m2 x .30 basecourse, 29,500 m2 compacted
concrete, 23,500 m2 bituminous surface treatment
incl. design, survey works, 35,250 m3 unclassified
excavation, 28,200 m3 subbase and 7,050 m3 base
course, storm drainage system with concrete
culverts, supply and instal. of 10kv high tension
line incl. poles, power station). all works
performed by Cegaz and always ahead of schedule and
completed four months before project completion
date. Schedule was accelerated because of user’s
requirement (U.S. Nas – Dea).
The project consisted of the design and construction
of site installations (fences, gates, site offices,
warehouse for materials and tools, machine shop,
carpentry shop, welding shop, powerhouse building,
aggregates crush plant, concrete plant, storage
areas, water supply systems incl. deep well - water
tanks and underground storage tanks, sewer systems,
electrical supply systems, dressing and sanitary
installations for workers, kitchen and cafeteria),
preliminary works, earthworks, pavement, concrete
works: reinforced concrete in footings, beams,
slabs, columns, rigid pavement, masonry, stucco,
revetments and plaster, steel structures, wood
works, steel works, sanitary installations,
electrical installations (high tension supply line
incl. power station) & supply and installation of
other equipments (rollup door, 4.00 ton overhead
bridge crane, heavy compressor and air compressed
line, 6 motorized 4.50 ton sliding hangar doors,
deep well with an hydropneumatic water supply
system, electrical grounding system, lightning
system, telephone system, against-explosion special
electrical outlets 110 volts and 230 volts, HVAC
systems); access roads, fire lane road, emergency
procedures training area, incl. 3/8” bituminous
surface treatment, and storm drainage system with
concrete culverts.
|
|
1 |
Clearing
and Grubbing |
m2 |
35,250 |
|
2 |
Non
classified excavation |
m3 |
28,200 |
|
3 |
Subgrade
shaping |
m2 |
30,000 |
|
4 |
Compact
Concrete (e = 4") |
m2 |
29,500 |
|
5 |
Selected Subbase
"D" |
m3 |
30,600 |
|
6 |
Crushed
base graduation "B" |
m3 |
8,850 |
|
7 |
Geotextil
|
m3 |
6,000 |
|
8 |
Flexural
Concrete slab |
m3 |
1,800 |
|
9 |
Reinforced
structural concrete |
m3 |
800 |
|
10 |
Sheet
asphalt 5 cm. |
m2 |
23,500 |
|
11 |
Storm
drainage system |
ml |
4,800 |
|
12 |
Water
supply well 8" |
ml |
60 |
|
13 |
Pump house with motor driven pump of 8 lts /
sec. and hydro pneumatic system |
unit |
1 |
|
14 |
Power
House including Generator of 300KVA |
unit |
1 |
|
15 |
Supply and installation of high tension line 10
KV incl. Poles |
ml |
2,800 |
|
16 |
Manholes |
unit |
98 |
|
17 |
Supply and installation of metallic rigidly
framed structure line (Hangar) (280 Ton.) |
m2 |
2,400 |
|
18 |
Supply and installation of electric large sliding
doors (Hangar) |
m2 |
480 |
|
19 |
Supply and installation of electrical systems
(including primary and secondary net,
security and emergency circuits, special AC/DC circuits for testing
helicopter motors) |
unit |
1 |
|
20 |
Supply and installation of sewer system
(including manholes, grease traps, septic tanks, chlorination tanks, oxidation pond) |
unit |
2 |
|