Main Distribution Frame Building; approx. Building Area=190 m2, include construction with Concrete Unit Masonry Walls, metal roof system, supply and installation of Air Condition System with duct work, supply and installation of fire alarm system, installation of acoustic ceiling tiles, vinyl tiles, installation of panels of Gypsum Wallboard, installation of fire alarm system, installation of windows and insulation metal doors and installation of downspout and gutters.
 

1 Excavations m3 300
2 Filling and backfilling m3 160
3 CMU Wall m2 250
4 Roof Paneling m2 200
5 Insulation Metal Doors unit 4
6 Aluminum Windows unit 8
7 Gypsum Wallboard m2 40
8 Acoustic Ceiling Tiles m2 120
9 Vinyl Tile m2 125
10 Packaged air conditioning 8 TN unit 1
11 Painting m2 450