Project Name :
 UPGRADE WATER DISTRIBUTION
 SYSTEM, PHASE III
 
 Project Location :
 SOTO CANO AIR BASE, HONDURAS
 
 Project Links :
» Open new Project
» Close this Project
                 

Supply and installation of PVC Pipe 6” and 8”, supply and installation of fire hydrants, valves, bends, etc, demolition of existing concrete structures and asphalt pavement, new sidewalks and new asphalt pavement, seeding and grassing of all removing areas.
 

1 Removal of existing structures and asphalt m3 35
2 Excavation, trenching for Existing Utilities m3 3,305
3 Elimination of Unsatisfactory material m3 875
4 Filling and backfilling m3 2,995
5 Sand Bed m3 406
6 Reinforced steel in structures ton 6.5
7 Concrete in Floor Patching m3 115
8 Asphalt Pavement m2 375
9 Supply and Installation of PVC Pipe 8” m 1,200
10 Supply and Installation of PVC Pipe 6” m 800
11 Seeding and Grassing m2 2,500